An LSST.org project

Operations Readiness Criteria

  • Chuck Claver
  • Keith Bechtol
  • Robert Blum
  • Jim Bosch
  • Andrew Connolly
  • Leanne Guy
  • Željko Ivezić
  • William O’Mullane; Sandrine Thomas Add your name as you contribute

Abstract

This document collects together the elements that constitute the criteria for completeness of the Rubin Observatory MREFC Construction Project, DOE Rubin Observatory Commissioning, and the readiness for operations of the Rubin Observatory to conduct the 10–year Legacy Survey of Space and Time (LSST).

This is a living document and will be modified and refined as required throughout the remainder of the Project.

In addition to this document and references therein, the completion of the Rubin Observatory Project will be evaluated based on the LSST Project Execution Plan (LPM-17) and the Commissioning Execution Plan (LSE-390).

Download